Pond design and optimisation
A detention pond is sized by routing, not by a volume formula. The tool uses the modified Puls (level-pool) method: inflow, storage and outflow are solved together through time.
What you provide
Section titled “What you provide”- The inflow hydrograph - a triangular design-storm hydrograph, set by its peak flow and time to peak.
- The basin geometry - invert, bottom length and width, side slope and maximum depth, from which the stage-storage relationship follows.
- The outlet structure - an orifice, a weir, or both, at their invert levels.
What it computes
Section titled “What it computes”The full routed result: inflow against outflow hydrograph, peak outflow and attenuation, peak lag, maximum water level, freeboard, and the storage required.
The number that matters is usually peak outflow against the allowable discharge. That is what a consent or a downstream capacity limit is written in terms of.
Optimising
Section titled “Optimising”There is no automatic search: change the orifice diameter, the weir crest or the basin size and the routed result updates as you type, so you can walk the peak outflow down to the allowable discharge. This is worth doing rather than guessing: outlet size and required storage trade against each other, and the relationship is not linear.
Writing it into the model
Section titled “Writing it into the model”Like the culvert designer, this one can apply its result to the model: Place on map… writes a storage node with its stage-storage curve, the outlet structures as links, and the outfall they discharge to.
Multiple events
Section titled “Multiple events”A pond sized for one return period can perform badly at another. Check the design against several storms, and see Scenarios for comparing them side by side.