Worked example: Detention pond
Develop a green field and you make it shed water faster: roofs and roads replace soil, so the same storm leaves as a higher, sharper peak. A detention pond buys that peak back - it stores the extra water and lets it out slowly, so the pipe downstream sees no more than it did before the development.
This is the teaching model for that. It is the EPA SWMM detention-pond example - a generic, schematic 29-acre site, not a real location - and it answers the question every storage design starts with: how big does the pond need to be, and what controls how fast it empties?
Download the file
What is in the model
Section titled “What is in the model”| Site | 29 acres, seven subcatchments (S1-S7) draining to one storage pond |
| Pond | SU1 - pyramidal, 180 x 90 ft, 10 ft deep, 2:1 side slopes |
| Outlet | a side orifice at the pond floor (small storms) + a weir set higher up (large storms), both discharging to a culvert and on to the outfall |
| Comparison | a PreDevelop subcatchment carrying the pre-development hydrograph for the same 29 acres |
| Storms | three design storms as time series - 2-yr, 10-yr, 100-yr - one rain gage, switch between them |
It opens in Schematic view (no map) because it is a generic teaching model, not a real place.
The goal, and whether it is met
Section titled “The goal, and whether it is met”The design target is simple: the pond’s outflow peak must not exceed the pre-development peak, for every storm you care about. Run each storm and compare. Here is what the model produces:
| Storm | Pre-development peak | Pond outflow peak | Pond full | Goal |
|---|---|---|---|---|
| 2-yr | 4.14 CFS | 3.72 CFS | 17% | met |
| 10-yr | 7.33 CFS | 5.66 CFS | 38% | met |
| 100-yr | 31.60 CFS | 29.63 CFS | 90% | met |
Two things are worth reading off that table. First, the pond holds the outflow at or below the pre-development peak in all three storms - it does its job. Second, look at the “pond full” column: the 100-yr storm fills it to 90%, leaving about a tenth as freeboard. That is not luck - the pond is sized so its volume is close to the extra runoff the 100-yr storm produces, with a margin. A pond much smaller would overtop; a pond much larger would be wasted concrete.
Why the outlet matters more than the pond
Section titled “Why the outlet matters more than the pond”The instinct is to size the pond. But a pond only stores water - what sets the outflow hydrograph is the outlet structure. This model shows the standard two-stage design:
-
A side orifice at the pond floor. It throttles the small, frequent storms. On the 2-yr the water never rises far, so the orifice does all the work and the pond barely fills.
-
A weir set some distance above the floor. It stays dry until a big storm pushes the level up to its crest, then adds a second, higher-capacity release so the pond does not overtop on the 100-yr. On the small storms it does nothing.
Trying it yourself
Section titled “Trying it yourself”-
Run as shipped (the
2-yrstorm) and note the pond outflow peak and how full it gets. -
Switch the storm. Select the rain gage, and in its Rainfall Source change the time series from
2-yrto10-yr, then100-yr. Re-run each and watch the pond fill and the weir come into play on the largest event. -
Graph the comparison. Use Graph ▸ Quick graph on the
PreDevelopsubcatchment (its runoff) and on the pond’s outfall (its outflow) to see the peak-shaving directly - the pre-development hydrograph and the controlled release on the same axes. -
Design a pond from scratch. Design tools ▸ Pond Designer sizes storage by the modified-Puls method from an inflow hydrograph and a target outflow - so you can arrive at a size analytically and then confirm it by simulation here, rather than guessing and hoping.
What this example does not show
Section titled “What this example does not show”- It is a generic, schematic model, not a real site. The coordinates are a layout, not a location, so it opens in Schematic view with no basemap.
- The three storms are design hyetographs, not observed rainfall - there is no measured record to calibrate against here (that is what Warkworth is for). This example is about design logic, not calibration.
- Water quality is not modelled - this is runoff quantity and storage only. For build-up and wash-off through a pond, see PFAS and note that a pond does little for dissolved pollutants.
- Pond / storage design - sizing storage by the modified-Puls method
- Reading results - continuity, peak flows and storage
- Worked example: Pump control - the other generic teaching model, on solver trust