Temporary discharge and the consent position

An over-pump has to discharge somewhere. Where that somewhere is a watercourse, the discharge needs the regulator’s agreement, and the conversation goes better when it opens with numbers.

In Temporary works, open the Discharge & consent section.

Enter where the over-pumped flow goes under Discharge to: a watercourse, a surface-water sewer, a manhole. The tool then reports the characteristics of what would be pumped:

  • Volume and duration, and the hours over which it is discharged
  • Flow rate at the proposed duty
  • Character, storm-influenced or dry weather. A dry-weather discharge is flagged as a finding to resolve, because foul flow reaching a watercourse in dry weather is treated as a breach on its face under either regime
  • Pollutant concentrations at the suction points, taken from the run where the model carries water quality

Concentrations are shown beside the published EA storm-overflow reference, with anything over it flagged. That reference is guidance, not the condition on your permit, and the tool says so.

If the model carries pollutants but the run reports no concentration at the suction points, the tool says so in the report rather than leaving the row empty. An absent number and a zero are very different things to a reader, and silence reads as zero.

The checks follow the regime set in the spill register. Under UK EA, a concentration above the reference is also raised as a finding to check. Under US NPDES, the tool asks for a named receiving water, which it takes from the spill register’s permit details. A model in US customary flow units defaults to NPDES.