Worked example: Watertown
Watertown is a real combined sewer network of 327 junctions, shipped with the application in two unit systems. It is the model used throughout this documentation, so following it here makes the rest of the guides concrete.
US customary (CFS · ac · in)
Follow it through
Section titled “Follow it through”-
Open the model. Use a card above. The network appears on the basemap, already georeferenced.
-
Look at what you have. With nothing selected, the Properties panel lists the element counts. Open Flex Tables to see junctions, conduits and subcatchments as grids.
-
Run it. Press Simulate. This is a dynamic-wave model, so it takes a little time - that is the engine solving real hydraulics, not a delay.
-
Check continuity first. In the summary, flow routing continuity should be small. If it were large, nothing below would be worth reading.
-
Find the bottlenecks. Flex Tables → Conduits → click d/D twice to sort descending. The pipes running full sit at the top, in red.
-
See where they are. Click the map icon in the
d/Dheader, or use Shade map by d/D in the design check. Look at whether the full pipes form one continuous run or scattered spots - those mean different problems and different fixes. -
Get the ranked read. Results tab → Design check. Flooding, surcharge, capacity, velocity and slope issues, ranked, each with locate →, plus suggested next steps.
What to notice
Section titled “What to notice”Combined systems flood in wet weather by design. Watertown has overflow structures, and seeing spill volumes in the water balance is the system working as intended, not a modelling error. The question a combined model answers is not “does it overflow” but “how often, how much, and where does it go”.
Capacity and velocity pull in opposite directions. Pipes large enough never to surcharge run too slowly in dry weather to stay clean. The design check flags both, and the tension between them is the actual design problem.
Other worked examples
Section titled “Other worked examples”Ten more worked examples cover other countries, unit systems and system types - from a detention pond and a pump-control benchmark to full studies such as Buzet and Oldham & Royton. The Help home lists them all.