Options and units
Open Calculation options from the toolbar gear.
SWMM does not convert units, it reinterprets them. The flow unit you choose declares which system the whole model is in:
| Flow unit | System | Lengths | Areas | Rain |
|---|---|---|---|---|
| CFS, GPM, MGD | US customary | ft | acres | in/hr |
| CMS, LPS, MLD | Metric | m | hectares | mm/hr |
Everything in the application follows the model’s system, including thresholds. A self-cleansing velocity of 0.6 m/s and 2.0 ft/s are the same rule expressed in each system.
Routing method
Section titled “Routing method”| Method | Use it when |
|---|---|
| Steady flow | Quick screening only. No storage, no backwater. |
| Kinematic wave | Fast, stable, branched networks. Cannot represent backwater or surcharge. |
| Dynamic wave | Anything with pressurised flow, backwater, loops, pumps, weirs or storage. |
Dynamic wave is required for CSO structures and any surcharging network, and it is the reason long runs take real time. If you are modelling overflows, this is not optional.
Time steps
Section titled “Time steps”- Routing step is the hydraulic solver’s step. Too long and continuity error climbs.
- Wet and dry steps control runoff calculation during and between storms.
- Report step is how often results are written. It does not affect accuracy, only resolution and file size.
Dates and duration
Section titled “Dates and duration”Start and end date and time define the simulation window. Total duration is derived, and editing it moves the end date.
For a design storm, allow enough time after the rain stops for the network to drain, or you will cut off the peak you were trying to see.
What to check before trusting a run
Section titled “What to check before trusting a run”- Flow units match the model’s actual units.
- Routing method suits the network (dynamic wave if anything surcharges).
- Duration covers the storm and the recession.
- After running, continuity error is small.