Pollution prevention and compliance
Once a model reproduces build-up and wash-off, it can answer the questions regulators ask.
The workflow, end to end
Section titled “The workflow, end to end”Work through the four tabs of the Water Quality / SWPPP panel, opened from the toolbar. You never need to close it: the run and re-run buttons are on the tabs themselves.
-
Setup - seed the model. Pick your target pollutants (TSS, phosphorus, metals, bacteria) and press Set up water quality. The NURP/NSQD library adds the pollutants, four land uses assigned to each subcatchment from its percentage impervious, and build-up and wash-off coefficients converted to your units. Set the antecedent dry days so pollutant accumulates before the storm.
Instead of the library defaults you can seed measured event-mean concentrations from the National Stormwater Quality Database (NSQD v4.02, roughly 9,000 EPA-endorsed events) by EPA Rain Zone. The zone is detected automatically for a georeferenced model, and these regional medians are citable in a report. Outside the US, import your own regional EMC library through Method ▸ Event mean conc. · custom regional as a land use / pollutant / EMC CSV.
PFAS is set up separately, as a dissolved zero-decay constituent.
-
Run it. Simulate WQ runs the active scenario and drops you on the Results tab.
-
Results - read the baseline. Check load per pollutant against your target, the mass balance (washed off vs discharged vs trapped) with its quality-continuity error, and the outfall pollutograph with its first-flush share.
-
Controls - add the plan. Node treatment (fixed percentage removal or first-order decay at a pond, vault or outfall), LID and source-control removals, and street sweeping. Use the Apply typical BMP removal and sweeper presets rather than starting from zeros. Node treatment is the reliable lever because it works on dissolved pollutants too; see biofiltration BMPs. Re-run from this tab.
-
Compliance - prove it. Pick the baseline and plan scenarios, Run & compare for the load reduction, enter your TMDL or permit limit per pollutant for a pass/fail, and export the SWPPP report as PDF.
For a pre-versus-post comparison, add the controls as plan treatments on a Post-Plan scenario in the scenario builder, so the untreated baseline is preserved rather than overwritten.
The usual questions
Section titled “The usual questions”How much load leaves this site? Total mass over a period, per outfall. This is the baseline everything else is measured against.
Does a control measure work? Model it as a scenario and compare load. A settling structure, a swale or permeable paving each change loads differently, and the comparison is quantitative rather than a matter of assertion.
Which sources dominate? Because land uses carry their own parameters, you can see which surfaces contribute most, and target them instead of treating everything alike.
What happens in the first flush? Systems designed to capture the first flush need the volume and timing of it, which is a modelled output rather than a rule of thumb.
Building a defensible case
Section titled “Building a defensible case”Support the case with:
- Continuous simulation so loads are annual and frequency-based rather than one event.
- Local sampling wherever available, to calibrate rather than assume.
- An explicit statement of assumptions, since a reviewer will ask.
Getting the numbers out
Section titled “Getting the numbers out”Results export as CSV for further analysis, and the printed report carries the model summary, continuity and design check alongside the loads, so the analysis travels with its own provenance.