CSO forecasting

The same model that answers design questions can answer an operational one: is the network going to spill in the next few days?

  1. A weather forecast is fetched for your model’s location.
  2. The forecast rainfall is applied to the rain gages.
  3. The model runs, unchanged, on a copy.
  4. Flow over every overflow structure is integrated into spill volume and timing.

The model is not modified. The forecast run happens on a clone.

Three days, seven days or fourteen days. Skill falls off with distance, and beyond about a week rainfall forecasts are indicative rather than quantitative. A fourteen-day run is useful for “is anything coming” and not for “how many cubic metres”.

Rather than one deterministic forecast, an ensemble runs several plausible rainfall outcomes so the result is a probability rather than a single number. “Spill likely in 3 of 5 scenarios” is more honest and more actionable than a single volume presented as fact.

For the next two hours, a radar-based nowcast gives much higher resolution than a numerical forecast. This is the horizon on which an operator can actually act - move a pump, open a gate, get a tanker on site.

  • Precipitation chart for the forecast window.
  • Spill table per structure: volume, peak flow and timing.
  • Water balance showing where the water came from and where it went.

See Water balance and spills.