Embodied carbon in the capital programme
The CIP optimiser ranks interventions by risk reduction per pound. AMP8 makes carbon reporting mandatory and PAS 2080 is the framework it is reported against, so a UK utility now has to defend a programme on both axes.
Switch the objective between cost and carbon in the optimiser.
The two axes disagree, and that is the whole point
Section titled “The two axes disagree, and that is the whole point”A liner costs about half a replacement and emits about a tenth of it, because it avoids the excavation, the spoil, the haulage and the new pipe.
- Rank by cost and replacement often wins on durability.
- Rank by carbon and relining wins by a distance.
A tool that showed only one axis would be quietly making that choice for you. Both are reported side by side, and the programme total is given in tCO₂e alongside its price.
The budget is still money
Section titled “The budget is still money”Even when you rank by carbon, the constraint remains a money budget. The optimiser is answering “given what I can spend, which programme buys down the most risk per tonne of CO₂e”, not “what if carbon were the currency”. Saying so plainly in the report keeps it out of a misreading that would be easy to make and hard to spot.