Open the model
Worked example: Lebanon
Lebanon sits in the semi-arid high plains of Kansas - a few miles from the geographic centre of the contiguous United States. Its storm-drainage network was laid out to a 2-year design standard, but climate change and ageing pipes have caught up with it. This example asks a different question from the others: not is the model right (Warkworth) or what does it cost (Bello), but how good is the level of service, and what would it take to restore it?
Download the file
What is in the model
Section titled “What is in the model”| Network | 128 junctions, 128 conduits, 128 subcatchments draining to one outfall |
| Origin | built from open map data with Land-use / Polygon geo-to-model over the real Lebanon, KS |
| Forcing | a 2-year, SCS Type II design storm (the built-in standard the network was sized to) |
| Units | US customary (CFS / acres / inches); real geography, opens on the Streets basemap |
| Routing | dynamic wave, Horton infiltration |
1. The baseline: it no longer meets its own standard
Section titled “1. The baseline: it no longer meets its own standard”Run the model (the green Simulate button). It solves clean - flow-routing continuity -0.01%, no errors - but the results are not clean:
- 4 manholes flood (
MH4_C19,MH166_C82,MH167_C82,MH292_C154), - 12 of 128 conduits run full (at capacity), and
- about 4.8 million gallons spills to the surface.
Colour the map by flooding (Map tab) to see the four red nodes, and by capacity to see the surcharged trunk. Open a node’s Results graph to watch the hydraulic grade line climb over its rim. The 2-year storm the network was designed for now overwhelms it in four places - the signature of a system that has slipped below its standard as rainfall and demand grew.
2. Level of service: a D-grade
Section titled “2. Level of service: a D-grade”Open Resilience & adaptation ▸ Level-of-service score…. It re-runs the network across a ladder of regional design storms (semi-arid Southwest IDF, SCS Type II) and distils a single grade - the largest storm the network passes with no surface flooding:
| Design storm | 24-h depth | Flooded manholes |
|---|---|---|
| 2-yr | 1.9 in | 0 |
| 5-yr | 2.5 in | 4 |
| 10-yr | 3.0 in | 24 |
| 25-yr | 3.7 in | 32 |
| 50-yr | 4.2 in | 48 |
| 100-yr | 4.9 in | 69 |
Flood-free to the 2-year storm, but it floods at the 5-year → Grade D, resilience index 78/100. Marginal, with clear room to improve.
3. Climate stress test: the driver
Section titled “3. Climate stress test: the driver”Doing nothing is not a static choice. Open Resilience & adaptation ▸ Scenario comparison… and run Baseline vs Climate +15% vs +30% (rainfall intensified for a mid- and end-century warmer atmosphere):
| Scenario | Flooded manholes | Surface flooding |
|---|---|---|
| Baseline (today) | 4 | 4.8 M gal |
| Climate +15% (mid-century) | 13 | 10.7 M gal |
| Climate +30% (end-century) | 24 | 17.3 M gal |
A 15% wetter storm triples the flooded manholes; a 30% one sextuples them and more than triples the spilled volume. The case for adaptation is not the 4 nodes flooding today - it is the 24 flooding if nothing is done.
4. Adaptation: detention lifts D → C
Section titled “4. Adaptation: detention lifts D → C”Open Resilience & adaptation ▸ Guided detention storage…, size it at the 5-year storm and let it place basins. It puts an offline detention basin beside each flooding manhole - a side storage node with an inlet weir at the rim (only the overflow spills in) and a controlled outlet, so the gravity main keeps conveying and the basin only shaves the peak.
Four basins, about 960,000 ft³ (≈22 acre-feet) of storage, take the 5-year flooding to zero - Grade D → C. Save it as its own project (Save as project → Lebanon-detention (5-yr)), re-run, and the four red nodes are gone. The Basins table lists each basin’s footprint, depth and volume - graph it to size the land you would need to buy.
5. Refinement: is the railway crossing a hidden bottleneck?
Section titled “5. Refinement: is the railway crossing a hidden bottleneck?”C46 is a 5-ft pipe that carries the trunk under the railway. A crossing like that is not just a
pipe - the embankment throttles it by inlet control. Select C46 → Properties ▸ Cross Section ▸
Culvert inlet and give it an FHWA inlet type (e.g. concrete pipe, groove end with headwall). Re-run:
- conduits at capacity jump from 12 to 20 - the crossing backs water up into eight more pipes, and
- the 5-year flooding rises from 4 to 6 manholes.
The crossing is a bottleneck the plain model hid. A full fix pairs the detention above with twinning or upsizing the culvert - which is why we left it out of the baseline: it is a design lever to explore, not part of the standard the grade is measured against.
What this example does not show
Section titled “What this example does not show”- Illustrative IDF depths. The semi-arid Southwest return-period depths are a regional starting point, not a site-specific rainfall study - plug in your own DDF curve for a real assessment.
- A survey-grade network. It is derived from open map data (geo-to-model), a realistic system to reason about, not an as-built utility record. Inverts and pipe sizes are estimated.
- Sized structures. The detention basins are schematic (a footprint and a depth); a real design sets the outlet, the stage-storage curve and the emergency spillway.
- A screening grade, not a LOS study. The A-E grade is a flood-free-standard proxy; a formal level of service study weighs frequency, duration and consequence too.
- Worked example: Warkworth - is the model right? (calibration)
- Scenarios & planning - build your own climate and adaptation scenarios
- Reading results - the thematic map, profiles and flooding summary