Asset risk register
The asset risk register ranks the pipes in your model by Business Risk = Probability of Failure (PoF) x Consequence of Failure (CoF), each banded 1-5, so risk runs 1-25. It is the “Plan & Invest” stage of the platform: the register tells you what is risky, so a capital programme can target the right assets.
Open it from Resilience & adaptation ▸ Asset risk register (CIP).
Why our consequence score is different
Section titled “Why our consequence score is different”Incumbent GIS tools score consequence from static attributes and a hand-entered “criticality” field. SWMM Web derives CoF from the hydraulic model you already built - change the network, re-run, and the register updates itself. It is consequence you can simulate:
- Criticality - how much of the network drains through a pipe (its upstream reach)
- Service - the customers / buildings in that pipe’s upstream sewershed
- Environmental - whether the pipe’s failure or backup reaches a CSO or outfall
- Financial - a size x length repair-cost proxy
Probability of failure
Section titled “Probability of failure”PoF blends:
- Hydraulic stress - how full the pipe runs (from the last simulation’s results)
- Size - smaller mains fail more often per length
- Condition - age vs. material service life, or a CCTV grade when you import condition data (which overrides the age curve)
Reading the register
Section titled “Reading the register”- A 5x5 heatmap counts conduits by PoF x CoF band (green -> red).
- A ranked register table lists the highest-risk conduits, with the “top drivers” that pushed each up the list; click a row to locate it on the map.
- A map choropleth shades every conduit by its risk band.
- Weighting is adjustable - utilities weight the aspects differently, so the PoF and CoF weights are exposed and re-score live.
From risk to a funded plan
Section titled “From risk to a funded plan”The register is the start of a loop that closes in one tool:
- Condition data - import CCTV grades to sharpen probability of failure.
- Capital plan (CIP) - a budget-constrained optimiser picks the interventions with the most risk reduction per dollar, applies them to the model, and re-runs to verify the hydraulic gain.
- Financial plan - turn that programme into a 20-year funding plan: the debt-to-PAYGO mix and the smoothed rate increase that pays for it, held to DSCR and days-cash targets.
Requires a Utility plan.