Skip to content

Water quality modelling

SWMM models pollutants as mass that accumulates on surfaces between storms and washes off during them.

Build-up. Mass accumulates on each land use during dry weather, following a power, exponential or saturation function of the antecedent dry period. Long dry spells mean more available mass, which is why the first storm after a dry summer is often the worst.

Wash-off. Runoff mobilises that mass. Rate depends on runoff intensity, which is why concentration peaks early in a storm and then falls - the first flush.

Treatment. Removal at a node, expressed as a function or a fixed efficiency, for representing an interceptor, a settling tank or a treatment works.

  1. Define pollutants - name, units (mg/L, ug/L or counts), rain and groundwater concentrations, and decay.
  2. Define land uses and give each one build-up and wash-off parameters.
  3. Assign land uses to subcatchments as percentage coverages.
  4. Optionally add treatment at nodes.

The mechanism is generic, so it is not limited to conventional determinands. TSS, total phosphorus and lead are conventional; PFAS and other emerging contaminants are modelled the same way, given build-up and wash-off parameters.

The pollutograph - concentration through time - tells you more than a peak value. Look for whether a first flush exists, how long elevated concentrations persist, and how that lines up with the flow hydrograph.

Load, the product of flow and concentration integrated over time, is what a receiving water actually experiences and what most consents are written against. A low concentration at high flow can be a larger load than the reverse.

Quality continuity is reported alongside flow continuity, and deserves the same scepticism: if it is poor, the loads are not trustworthy.