Capacity for development
A developer asks whether 200 homes can connect at a manhole. Open Operations & reports ▸ Capacity for development.
Sizing the development
Section titled “Sizing the development”Two ways, and you pick per assessment:
By dwellings. Enter the number of dwellings and the tool derives population from an editable occupancy (default 2.4 persons), turns that into average flow through the same dry-weather flow coupling used elsewhere in the app, and applies a Harmon peaking factor. Harmon, not a constant: 20 homes peak harder per person than 2000 do, and a flat factor quietly oversizes every large connection.
An I&I allowance is added as a percentage where you want one.
By flow rate. Enter a figure you already have, such as a trade-effluent consent, and it is used exactly as entered. It is not multiplied by a return fraction or a per-capita rate you never chose. Apply a peak factor only if you give one.
Every assumption comes back out
Section titled “Every assumption comes back out”Whichever route you take, the tool lists the derivation in words:
200 dwellings × 2.4 persons = 480 people · 380 litres per person per day · 80% returned to sewer · plus 10% infiltration · Harmon peaking factor 3.98
The point is that a reader can argue with the numbers rather than with the tool. The per-capita rate follows the model’s units, so a US customary model derives from gallons.
What it reports
Section titled “What it reports”The development flow is added to whatever the connection node already carries, never replacing it, and the model is run again. The comparison separates two things that are routinely flattened together:
- Nodes flooding, which reached the surface, and whether that is new or worse
- Nodes rising, which surcharged further without reaching the surface
A node pushed from 2.1 m to 2.6 m inside a 3 m manhole has not flooded, and listing it beside one that reached the street would destroy the distinction a reader needs most.
Also reported: extra volume to the surface, and the change in discharge through the outfalls. Where discharge cannot be totalled, the tool says so rather than reporting zero.
Two reporting conventions worth knowing
Section titled “Two reporting conventions worth knowing”A node with a large surcharge allowance can report a depth of hundreds or thousands of
metres. That is a genuine pressure head, not water two kilometres up a manhole, and such
rows are marked as such. Separately, a node whose maximum depth is 0 in the input is one
SWMM derives from the connected links, so the tool leaves the rim blank rather than printing
0.00 and inviting the misreading.
Requires a Pro plan.